Menu

Cynthiana By-Pass

Back to Project Gallery

Owner:Commonwealth of KY Transportation Cabinet
Frankfort, Kentucky
Project Cost:$12,900,000
Projected Completion Date:2013

US 27 CYNTHIANA BYPASS SECTION 1
Harrison County, Kentucky

This project consists of the new construction of US 27 Bypass along the West side of Cynthiana, KY. Project includes construction of two 250 ft PCI-Beam bridges over Grays Run Creek and KY 36 as well as one 900 ft structural steel girder bridge over CSX railroad and the South Fork Licking River. Our scope of work consists of the following:

  • Clearing and Grubbing
  • Temporary Creek Crossings
  • Temporary Diversions/Traffic Control
  • Roadway Excavation
  • Roundabout
  • Drainage/Storm Sewer Installation
  • Erosion Control
  • RCBC Construction
  • Bridge Construction